Welcome Customer !

Membership

Help

Henan Kusite Instrument Technology Co., Ltd
Custom manufacturer

Main Products:

plast-mach>Products
Product Categories

Henan Kusite Instrument Technology Co., Ltd

  • E-mail

    176917765@qq.com

  • Phone

    15803995802

  • Address

    Zhongde Industrial Park, Xuedian Town, Xinzheng City, Zhengzhou City

Contact Now

Which is a good supplier of vacuum strip furnaces

NegotiableUpdate on 03/31
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Kuster Technology vacuum strip furnace vacuum rapid solidification furnace uses induction heating or resistance radiation heating to heat the sample in the crucible to a molten state under high vacuum or inert gas protection atmosphere, and then rapidly solidifies into amorphous or microcrystalline strips on the surface of high-speed rotating copper or molybdenum wheels through gas pressure spraying

Product Details


Strip furnace, induction furnace, KSD-3 vacuum rapid solidification furnaceEquipment features



1·The melting speed is fast,Sample testing can be completed within 10 minutes


2. Wide temperature range: 500-1700, 800-2000, 1000-2400


3·capacitycustomizablefrom5gto50KgAll can be achieved


4·Adjustable linear speed can be achieved0~70rice/secondadjustment


5·Vacuum configuration can be selected10Pa ~10-5Pa


6·Sample cooling rate:105-106K/S


7·Strip thicknessAdjustable width:20- 60Microns, width:1-30millimeter

(Depending on crucible nozzle specifications)


8·Speed regulating motorAdopting servo motor configurationMagnetohydrodynamic drive structure,structure

Compact and reliable sealing


9. Can be melted under various atmospheric conditions: vacuum, vacuum+atmosphere

Protecting atmospheric conditions

Strip furnace, induction furnace, KSD-3 vacuum rapid solidification furnace Scope of application materials

1·New rare earth permanent magnet materials

2·Amorphous soft magnetic materials

3·Development and research of nanomaterials science

4·high-entropy alloy Metal alloys, mixed materials

5Non metallic andDevelopment of battery materials

installation and debugging

Within one month after the contract takes effect, we will provide the user with equipment foundation construction drawings and equipment installation interface conditions.

After the equipment arrives at the user's installation site, we will send installation engineers to the site within 5 working days for installation and debugging until the equipment meets the technical specifications and ensures that the product meets the relevant technical requirements.

3. Equipment installation: When assembling the equipment, the equipment installation personnel should clean the various components of the equipment as necessary to ensure its performance and reduce the repair rate.

4. Equipment debugging: Equipment debugging personnel strictly follow technical specifications when debugging equipment until all indicators of the equipment meet the design requirements.

Service Requirements

a)Training and installation debugging

We provide training to the users on the use and daily maintenance of the equipment. Due to the special nature of the equipment, it is recommended to assign a dedicated person to handle it, and strictly implement equipment usage regulations for beginners, such as pre use training, post use inspection, and recording of operation and use.

b)warranty period

The warranty period is from the factoryAcceptance completedFrom that day on12A month.

c)after-sales service

We promise to provide lifelong after-sales service, including equipment maintenance and repair, and the provision of spare parts. Our technical personnel received a written notice from the user requesting maintenance8Make corresponding actions within hours (working days). If it is necessary to rush to the user's work site, our technical personnel will notify us in writing48Bring the corresponding components to the user's workplace within hours.