-
E-mail
1742139611@qq.com
-
Phone
15956370722
-
Address
Shankou Road, Jingxian Economic and Technological Development Zone, Anhui Province
Anhui Changyu Pump Valve Manufacturing Co., Ltd
1742139611@qq.com
15956370722
Shankou Road, Jingxian Economic and Technological Development Zone, Anhui Province
Advantages of high lift acid resistant chemical pumpsIt is a pump equipment designed specifically for handling corrosive liquids. It usually has high sealing and stability to prevent corrosive liquid leakage and ensure the safe operation of equipment. In addition, acid resistant chemical pumps also have the characteristics of simple structure, easy installation, and easy maintenance. Widely used in chemical, petroleum, metallurgy, power, environmental protection and other fields, mainly for transporting various corrosive liquids such as sulfuric acid, hydrochloric acid, nitric acid, hydrofluoric acid, etc. Specific application areas include but are not limited to:
Chemical industry: used for transporting various corrosive liquids such as acids, alkalis, salts, etc.
Petroleum industry: used for transporting petroleum products such as crude oil and refined oil.
Metallurgical industry: used for transporting corrosive liquids generated during various metal smelting processes.
Electric power industry: used for transporting cooling water, desalinated water and other media.
Environmental protection industry: used for transporting liquids such as wastewater and sewage that require treatment.
Advantages of high lift acid resistant chemical pumpsInstallation sequence:
1. Place the unit on a foundation with embedded anchor bolts, and place pairs of wedge pads between the base and the foundation for alignment.
2. Release the coupling. Place a spirit level on the pump shaft or base, adjust the gasket, align the level of the unit, and tighten the anchor bolts appropriately to prevent movement.
3. Pour concrete into the base and anchor bolt inspection holes.
4. After the concrete dries up, the anchor bolts should be tightened and the flatness of the pump shaft should be rechecked.
5. After connecting the pipeline and determining the direction of rotation of the prime mover, connect the coupling and double check the concentricity of the shaft. Measure the difference between the outer circumference of the coupling, which should not exceed 0.1mm. The gap between the end faces of the two couplings should not exceed 0.3mm within one week
6. After 3-4 hours of actual operation of the unit, conduct a post inspection. If there are no adverse phenomena, it is considered that the installation is qualified.
It is a pump equipment designed specifically for handling corrosive liquids.