-
E-mail
2082139296@qq.com
-
Phone
15157394123
-
Address
No. 168 Xiangcheng Avenue, Yuanhe Street, Xiangcheng District, Suzhou City
Suzhou Tongquan Drilling Engineering Co., Ltd
2082139296@qq.com
15157394123
No. 168 Xiangcheng Avenue, Yuanhe Street, Xiangcheng District, Suzhou City
Shanghai drilling water well, Pudong construction site water well, Shanghai surrounding drilling team
Drilling and installation, quality three guarantees, fast construction period, large water output, up to 3-100 tons of water per hour. Our company has complete drilling equipment, suitable for different geological exploration. The drilling machinery includes QTP-50, which can drill wells to depths of 40-60 meters, SPQ-100, which can drill soil to depths of 40-88 meters, SPQ-150, which can drill wells to depths of 200 meters, and SPQ-180, which can drill wells to depths of 300 meters per day and is fast! Such as limestone, green rock, moderately weathered, strongly weathered, granite, use the same type of drilling machinery for different geological conditions.


Shanghai drilling water well, Pudong construction site water well, Shanghai surrounding drilling team
Deep water well water output: hourly water output: 3 tons -5 tons -8 tons -10 tons -12 tons -15 tons -17 tons -20 tons, water temperature 16-18 ℃, well depth 40-90 meters (self owned small water plant, well depth 100-800 meters, large water volume 30T-100T/hour).
Service projects: Well drilling construction team, shallow wells, civilian wells, farmland irrigation wells, aquaculture wells, rock wells, industrial water wells, air conditioning wells, water source heat pump wells, ground source heat pump well drilling, building seepage wells, precipitation wells, installation of air coolers, water air conditioning, factory ventilation and cooling engineering, etc.
Pay attention to areas with abundant water sources when drilling wells, and never blindly drill shallow wells; In areas with abundant shallow groundwater, it is suitable for farmers to build their own shallow wells, but the layout of the wells should not be too dense to avoid mutual influence between adjacent water source wells. According to the hydrogeological conditions of Mudanjiang City, the spacing between wells should generally not be less than 50 meters. After setting up a suitable water pump for the well, the dynamic and static water levels and corresponding quantities of the well should be measured based on the construction drainage situation during well drilling. Then, the total head of the water pump should be determined based on the height difference from the ground to the dynamic water level and the required working head of the water pump for irrigation. The flow rate of the water pump should not exceed the flow rate of the well. Based on the above two conditions, purchase the corresponding water pump. Ensure clear water quality and pure taste.