The comprehensive tester for excitation characteristics of transformers complies with national maintenance regulations

NegotiableUpdate on 01/17
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Principle of Chengde Transformer Excitation Characteristics Comprehensive Tester HDHG-P Transformer Voltage Current Characteristics Comprehensive Tester is mainly used for on-site detection of CT/PT's voltage current characteristics, transformation ratio, polarity, demagnetization, 5% -10% error curve, secondary side circuit inspection, and power frequency AC withstand voltage. The single machine output voltage can reach 1000V and the current can reach 600A, which can meet the testing environment of 500KV power transmission and transformation projects. During the experiment, only the test voltage/current value needs to be set, and there is no need to set the step size. The equipment can automatically boost the voltage/current and quickly display the voltage current characteristic curve, transformation ratio, polarity, and other experimental results of the transformer

Product Details

Product Introduction:
The HDHG-P transformer volt ampere characteristic comprehensive tester is mainly used for on-site detection of CT/PT's volt ampere characteristics, transformation ratio, polarity, demagnetization, 5% -10% error curve, secondary side circuit inspection, and power frequency AC withstand voltage. The single machine output voltage can reach 1000V and the current can reach 600A, which can meet the testing environment of 500KV power transmission and transformation projects. During the experiment, only the test voltage/current values need to be set without setting the step size. The equipment can automatically boost/boost the current and quickly display the transformer's volt ampere characteristic curve, transformation ratio, polarity, and other experimental results. It supports data saving and on-site printing, which not only saves the tedious labor of manual voltage regulation, manual recording, and curve drawing, but also uploads test data online with a laptop through a USB interface for editing, saving, or printing. Easy to operate and improve work efficiency, it is the preferred equipment for on-site testing.
II Features:
1. Safe and reliable:
MBC power control technology, single-phase AC220V input power supply, fully isolated output, designed more scientifically and reasonably, and used more safely and reliably.
Note: Other similar products use separate input methods for working power and power supply, and also require the use of three-phase AC380V dual live input to meet experimental requirements, which poses a great safety hazard and can easily cause accidents such as electric shock and even injury to users.
2. Comply with national maintenance regulations:
The power output of the equipment is all true voltage and current values, and the waveform is a standard sine wave with a frequency of 50-60Hz; it can effectively simulate the real state of the transformer and comply with relevant national maintenance regulations.
3. Fully functional:
The HDHG-P transformer volt ampere characteristic comprehensive tester can detect the volt ampere characteristics, transformation ratio, polarity, automatic calculation of inflection point voltage and current values, 5% and 10% error curves, secondary AC withstand voltage, CT primary current (secondary circuit inspection), and CT demagnetization of CT/PT, making it easy to achieve multi-purpose use of one machine.
4. Simple wiring method:
Adopting a single power input port; With only 8 test ports, all CT/PT testing projects can be completed. The wiring method is safe and simple, making it very suitable for on-site use. It can effectively reduce labor intensity and improve work efficiency;
5. Easy to operate: using a rotating mouse and a large LCD display, the operation is simple, the graphics display is clear, intuitive and convenient.
6. Fast printing: Using a thermal printer, it can quickly print detection data, which is very suitable for on-site data comparison.
7. Large capacity FLASH storage: can store 1000 sets of test data, not lost after power failure, and can be accessed at any time.
8. USB interface: convenient for connecting to modern laptops, uploading test data, editing and saving.
9. Small size and light weight: convenient for on-site use.
3: Technical indicators

Main testing functions

1、 For current transformers (CT):

2、 For voltage transformers (PT):

1. Voltage current characteristic test

1. Voltage current characteristic test

2. Variable ratio test

2. Variable ratio test

3. Polarity discrimination

3. Polarity discrimination

4. 5% and 10% error curves

4. Demagnetization

5. One flow test

5. Power frequency AC withstand voltage test

6. Demagnetization

6. Demagnetization

7. Power frequency AC withstand voltage test

Project/Name

HDHG-P

working power supply

AC220V (50~60Hz)

Volt ampere output voltage

0~1000V

Volt ampere output current

0-15 A

Variable ratio output current

0~600 A

Voltage current measurement accuracy

< 0.5%

Variable ratio measurement accuracy

< 0.5%

Operating Temperature

-10~50℃

Weight (Kg)

22

For more details, please follow Wuhan Huading Power Equipment Co., Ltd

.Safety management of power cable testing

3.1 The casing of experimental equipment (such as test transformers and control boxes) must be grounded, and the grounding wire should use multi strand soft copper wire with a cross-sectional area of not less than 4mm2. The grounding must be good and reliable. When there is no grounding terminal available, it can be connected to the switchgear cabinet. It is strictly prohibited to connect to water pipes, heating pipes

3.2 The metal casing of the tested equipment should be reliably grounded. The wiring of high-voltage leads should be firm and as short as possible, and high-voltage leads must be supported and fixed with insulators.

3.3Temporary barriers or ropes should be set up in the hazardous areas and ends of the on-site testing area and the tested system. Signs reading "Stop, High Voltage Danger!" should be hung outward, and a dedicated person should be on guard to prohibit unrelated personnel from approaching.

3.4 Before closing the circuit, the wiring must be checked first, and the other person in charge of the wiring is responsible for verifying and checking. The voltage regulator should be adjusted to zero and the on-site personnel should be notified to leave the testing area.

3.5 High voltage testing must be operated by a guardian. During the process of increasing pressure, the operators should be focused, the guardian should shout loudly, and the instructions should be clear and accurate. Operators should wear insulated gloves, insulated boots, or stand on insulated pads to operate.

3.6 The test power supply should have a double pole switch with obvious open circuit and a power indicator light. When changing the wiring or completing the test, the test power supply should be disconnected first, discharge (referring to equipment with capacitors), and short-circuit the high-voltage part of the boosting equipment to ground.

3.7Before conducting a voltage withstand test on electrical equipment, the insulation resistance should be measured first. When measuring insulation resistance with a shaking table, the tested equipment should be disconnected from the power supply. During the experiment, it is necessary to prevent the live parts from coming into contact with the human bodyPrinciple of Chengde City Transformer Excitation Characteristics Comprehensive TesterAfter the experiment, the tested equipment must be discharged.

3.8High voltage equipment in use should be considered to have voltage once its grounding wire or short circuit is removed, and it is strictly prohibited to approach.

3.9When encountering thunderstorms and strong winds above level 6, the high-voltage test should be stopped. It is not advisable to conduct high-voltage tests when the relative humidity exceeds 70%.

3.10 If any abnormal situation occurs during the experiment, the power supply should be immediately disconnected and the inspection can only be carried out after discharging and grounding.

3.11 After all experiments are completed, the person in charge of the work mustPrinciple of Chengde City Transformer Excitation Characteristics Comprehensive TesterCarefully inspect the site and confirm: ① There are no remaining items, tools, grounding wires, etc; ② All dismantled lead connections are intact and firm; ③ Cabinets, doors, boxes, and other areas have been restored to their original condition; ④ The protection that was temporarily exited or modified for debugging purposes has been correctly restored; ⑤ The wire ends that were removed or short circuited during debugging have been restored; ⑥ All members of the work team should evacuate the testing site.