Welcome Customer !

Membership

Help

Hebei Yuhang Wooden Pallet Co., Ltd
Custom manufacturer

Main Products:

plast-mach>Products
Product Categories

Hebei Yuhang Wooden Pallet Co., Ltd

  • E-mail

    bimeili123@163.com

  • Phone

    18832658690

  • Address

    Industrial Zone, Dacheng County, Langfang, Hebei Province

Contact Now

Factory direct sales of anti-corrosion and heat-insulating wooden pallets

NegotiableUpdate on 01/17
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Hebei Yuhang Air Conditioning Wooden Tray Factory has sufficient supply and affordable prices for DN 250mm. The outer diameter of the pipeline is 277, and the insulation thickness matches the thickness of the board: 100mm * 100mm. The wooden tray base is 277mm+200mm long, and the total length of the base is 477mm

Product Details

Hebei Yuhang Air Conditioning Wooden Tray Factory has sufficient supply and affordable pricesCheap DN250mm, The outer diameter of the pipeline is277Matching insulation thickness and board thickness:100mm*100mm, Wooden bottom seat length277Mm+200mm: The total length of the base is477mm.

Hebei Yuhang Air Conditioning Wooden Tray Factory has sufficient supply and affordable pricesmaterialDomestic red pine, poplar, and willow trees

Installation of riser clamps, with a floor height of less than or equal to5m, Install one on each floor; The floor height is greater than 5m, with no less than 2 units per floor. The installation height of the pipe clamp is 1.5-1.8m above the ground, and two or more pipe clamps can be installed evenly.

9. Anti sway brackets should be added at the end of the fire sprinkler pipeline, and the distance between the anti sway bracket and the end sprinkler head should not be greater than 750mm or less than 300mm. 10. Half light and half dark phenomena are not allowed in the installation of pipeline brackets. Install pipe supports on walls with tiles or stone, and the supports should be installed in the gaps between the tiles or stone. 12. The distance between the pipeline support and hanger and the welding joint shall not be less than 50mm. 13. When the length of the suspended air conditioning pipeline exceeds 15m, anti swing fixing brackets should be added. Plastic pipes and copper pipes should be installed according to the requirements of plastic pipes and copper pipes. When fixing plastic pipes with iron brackets, a 3mm rubber pad should be placed between the pipe and the bracket. The supports and hangers for air conditioning (air, water) pipelines should be equipped with insulation materials (wooden supports) and fixed on the brackets with measures taken. The thickness of the insulation material should not be less than the thickness of the pipeline insulation layer. The pipe hangers in the 18 machine room and exposed parts are subjected to slope angle treatment on the steel sections.

surface treatmentAsphalt paint immersion

wooden palletDifferent regions have different names, and some places are also called air conditioning wooden supports. It is mainly a connecting piece between the pipeline and the steel structure or concrete support that supports the pipeline. Firstly, it is used to prevent the stress caused by thermal expansion and contraction of the pipeline from affecting the pipe frame. Secondly, it plays a role in supporting (supporting) the pipeline and is a form of support.