  Typhoon passes, wind and rain temporarily rest
For manufacturing enterprises, weather not only affects production pace, but also affects the safe operation of every equipment.
It is particularly important to conduct standardized inspections and professional maintenance before restarting the injection molding machine when the accumulated water recedes.
From hydraulic and mechanical systems to electrical and servo systems, Changfeiya has organized the key steps for equipment re operation to assist in the safe return of equipment to production.
  01Safety first principle!
After the typhoon and rainstorm, the equipment may face the risk of ponding invasion, components being affected with damp, etc.
  Do not immediately power on and start the device after it has been drained of water.
From inspection, cleaning, drying, to testing and debugging,
Every standardized operation is an important guarantee for the safe recovery and operation of equipment.
  02Prepare all maintenance tools first
Small sun lighting, hair dryer, alcohol, puller, hammer, copper rod, dryer (for drying hopper) and a complete set of daily maintenance tools.
  03hydraulic system
  Check the oil status in the fuel tank to avoid operational risks.
According to the actual water inflow situation of the equipment,
Check if there is emulsification in the oil tank.
Check if the oil in the tank is emulsified (depending on the flooded level).
  04mechanical structure
  Clean and rust proof, restore equipment status.
Clean the flooded mechanical components and immediately carry out rust prevention treatment to protect the accuracy of the core structure.
  05Electrical system
  It is recommended to check whether there is obvious water ingress or not.
  Peripheral electrical part
Plug (valve, electronic rulerPressure sensor)The machine docking plug, intermediate junction box, travel switch, external three-phase plug and other components need to be cleaned and dried.
Components such as electric heating coils and lubrication pumps need to be cleaned and dried.
Check for water accumulation at the lowest point of the Changmo tube and drill holes for waterproofing if necessary.
  Internal electrical part
Contactors, computer boards, switch power supplies, transformers, relays, switches, and air switches and other components need to be disassembled for cleaning and drying.
  06servo system
  Fine inspection to ensure stable operation.
  controllerPeripheral accessories of servo controller (reactance, filter, etc.)servo motorAnd aviation plugs:
Open and inspect
Cleaning treatment
Fully dry
Please refer to the relevant instructions for specific operations.
  07The final crucial step: detection and power on
All electrical componentsAfter drying, it must be testedAfter confirming that there are no faults,Perform a single component power on test firstOnly after completing all individual tests can the whole machine be debugged.
  Changfeiya reminds: If the equipment is submerged in water, it must not be powered on after the water recedes!
  Safe resumption of production begins with meticulous investigation
  A standardized inspection reduces potential risks once.Changfeiya continues to pay attention to customers' production sites, providing professional services to accompany every safety recovery and assist in the stable operation of manufacturing!