Welcome Customer !

Membership

Help

Ankerui Electric Co., Ltd
Custom manufacturer

Main Products:

plast-mach>Products
Product Categories

Ankerui Electric Co., Ltd

  • E-mail

    2851386213@qq.com

  • Phone

    18217358524

  • Address

    No. 253 Yulu Road, Jiading District, Shanghai

Contact Now

Wholesale of Supply Exchange Form

NegotiableUpdate on 01/16
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

In a single inverter system, the instrument is directly connected to the inverter. If your frequency converter has a built-in income rating table (RGM; this frequency converter is called an income rating frequency converter), you can connect an AGF series rail mounted smart meter with UL certification on the same bus as the RGM.

Product Details

In a single inverter system, the instrument is directly connected to the inverter. If your frequency converter has a built-in income rating table(RGM; this frequency converter is called an income level frequency converter), you can connect one on the same bus as the RGMAGF series rail smart meter has UL certificate.

image.png



2 AGF series rail smart meter has UL certificateinstallThe installation instructions should specify the national electrical code and ANSI/NFPA 70 wiring method used.

2.1 Installation GuideThe instrument is connected to the frequency converter through RS485.AC wire specifications: 1.3 to 2.0 mm diameter/22-18 AWG stranded wire, 600 V, THHN, MTW or THWN type.

RS485 wiring specifications:Cable type: at least 3-wire shielded twisted pair (4-wire cable can be used)Wire cross-sectional area: 0.32-0.81 mm 2/24-18 AWG (can be used with Category 5 cables)


image.png


Instruments are considered as "connecting devices" and require disconnecting devices (circuit breakers, switches, or circuit breakers) and overcurrent protection(Fuse or circuit breaker)

The instrument consumes 10-30mAh, therefore the rated value of any switch, circuit breaker, fuse, and/or circuit breaker is determined by the wire gaugeThe power supply voltage and the required current interruption rating are determined.Switches, circuit breakers, or circuit breakers must be located near the instrument and easy to operate.Use circuit breakers or fuses with a rated current of 20A or less.When monitoring multiple lines, use grouped circuit breakers.Circuit breakers or fuses must protect power terminals labeled L1 and L2. In rare cases where there is overcurrent protection at the neutral pointIn this case, the overcurrent protection device must simultaneously interrupt the neutral point and ungrounded conductor.The circuit protection/disconnection system must comply with all national and local electrical regulations.

2.2 Installation and Connection of Instruments2.2.1 Installing Instruments1. The instrument should be installed in the distribution box2. Install the instrument on a 35mm German industrial standard guide rail

image.png


2.2.2 Installing CTs:Before closing the current transformer, turn off the AC power supply.2. Install current transformers around the tested conductor. The split core current transformer can be installed three times around the conductor. canSecure nylon zip ties around the CT to prevent accidental opening.3. Install CT with arrows pointing towards the grid for consumption or outlet measurement.The current transformer is packaged together with the electricity meter.

2.2.3 Connecting instruments:If you want to connect the instrument to the frequency converter, please refer to the connection diagram below

image.png


1. Confirm that the power is turned off before connecting.

2. Thread the grounding cable through the appropriate conduit and open the circuit breaker, and connect it from the 5-pin terminal block to the grounding terminal

3. Use a 5-pin terminal block to connect the AC side wires (instrument input):a、 Thread the wire through the appropriate conduit and open the knocker.b、 Loosen the corresponding screws on the 5-pin terminal block.c、 Connect each AC wire to the corresponding screw terminal (pins 1 and 2). Confirm the lines and labels on the front of the instrument panelSymbol matching.d、 Connect ground to pin 5 and neutral to pin 3.e、 Tighten the screw to ensure that the wire * is inserted and not easily pulled out.f、 Insert the 5-pin terminal block into the socket of the electricity meter, ensuring that it is securely fixed in the meter.

4. Connect the CT wire to the 4-pin terminal block (block 1):a、 Thread the wire through the appropriate conduit and open the knocker.b、 Connect the blue and brown wires according to the dots printed on the label: blue to pin 1/3, brown to pin 2/4.c、 Insert the 4-pin wiring board into the socket of the instrument, ensuring that it is securely fixed in the instrument

5. Connect the RS485 twisted pair to the 4-pin terminal block o (terminal block 2):a、 Thread the wire through the appropriate conduit and open the knocker.b、 Connect the wires to terminals A+and b -, and connect the shield to terminal G.c、 Insert the 4-pin wiring board into the socket of the instrument, ensuring that it is securely fixed in the instrument

6. Place the terminal block of the wiring board back to the side of the instrument panel.

image.png


Ankerui Electric Co., Ltd. (code: 300286) was established in 2003, integrating research and development, production, sales, and services. It is a high-tech joint-stock enterprise that provides energy efficiency management and electricity solutions for enterprise microgrids.

The solutions provided by Ankerui Electric include substation operation and maintenance cloud platform, safety electricity management cloud platform, environmental protection electricity supervision cloud platform, smart fire protection cloud platform, energy management cloud platform, industrial enterprise energy control platform, remote prepaid cloud platform, catering fume supervision cloud platform, electric vehicle/electric scooter charging pile charging management cloud platform, power monitoring/wireless temperature measurement system, power quality governance system, electrical fire monitoring system, fire equipment power monitoring system, fire door monitoring system, emergency lighting and evacuation indication system, intelligent lighting control system, medical isolation power insulation monitoring system, etc., helping users achieve energy intelligence, visualization, and refined management, improve energy efficiency and safety, Provide data services for energy conservation, consumption reduction, and digital energy construction for enterprises.

Ankerui Electric Co., Ltd. has a product ecosystem ranging from cloud platform software to terminal components. Currently, more than 10000 system solutions are running across the country, providing efficient and safe energy protection for users. Jiangsu Ankerui Electric Appliance Manufacturing Co., Ltd., a production base located in Jiangyin City, Wuxi, adopts lead-free production technology and has a fully functional product testing center. With the help of an information management system, the company's products are industrializedThe large-scale implementation provides guarantees. At the same time, the company has deployed sales and technical support teams in major cities across the country to quickly respond to customer needs and provide users with a good service experience.

After years of accumulation, the company has participated in many energy efficiency management projects, including the power quality management of the main venue of the 7th World Military Games, the power monitoring system of the Boeing aircraft completion and delivery center, the operation and maintenance cloud platform of the Jiading District School Substation, the emergency lighting and evacuation indication system of Tianshui Sports Center, the prepaid cloud platform of Hangzhou Dajiang Dongbaolong Square, the power monitoring and intelligent lighting control system of station buildings such as Qujing North Station, Songming Station, and Fuyuan North Station on the Shanghai Kunming High speed Railway, and the power management system of dormitories in Guangling Campus of Yangzhou University; The foreign markets include Africa, the Middle East, Southeast Asia, South America, and so on. The rich market experience has enhanced the company's brand influence and won widespread praise in terms of product quality and service.

Since its listing in 2012, the company has maintained stable growth. Adhering to the concept of "innovation, efficiency, unity, and integrity", the company will persist in stable operation and continuous innovation, provide users with more and better solutions, products, and services, and contribute to the sustainable development of society.