-
E-mail
727225062@qq.com
-
Phone
13323269659
-
Address
Liugezhuang Town Economic Development Zone, Dacheng County, Langfang City, Hebei Province
Langfang Huaneng Hongyu Building Materials Co., Ltd
727225062@qq.com
13323269659
Liugezhuang Town Economic Development Zone, Dacheng County, Langfang City, Hebei Province
Saint Yude B1 grade rubber is soft and easy to install. Pipeline installation: It can be installed together after being fitted, or the pipe can be longitudinally cut and then glued together. For complex components such as valves, tees, elbows, etc., the boards can be cut and wrapped in different shapes for bonding to ensure the tightness of the entire system, thereby ensuring the insulation of the entire system. Moreover, due to the smooth and even rubber surface of this material, as well as its excellent performance, there is no need to add additional vapor barriers or protective layers, which reduces the trouble during construction and ensures a beautiful and smooth appearance.When equipment or pipeline maintenance is carried out, the stripped material can be reused without changing its performance.
Saint Yude~A low-priced flame-retardant B1 grade rubber brand in Hebei Province

Saint Yude~A low-priced flame-retardant B1 grade rubber brand in Hebei Province
Saint Yude B1 grade rubber is very safe to use, as it does not irritate the skin or harm health. They can prevent mold growth, prevent pests or mice from biting, and are acid and alkali resistant, with superior performance. These performances enable YumesB1Grade rubber becomes an ideal insulation material for protecting pipelines, preventing them from corrosion due to atmospheric media or industrial environments.
Application fields:
·Air conditioning system refrigeration unit and equipment
·Freezing water pipe
·Condenser water pipe
·Air ducts and hot water pipelines.

The installation of rubber insulation materials should pay attention to the following points:
1、 All cutting gaps and joints need to be bonded and sealed with specialized adhesive for rubber construction.
2、 After installation, all tees, elbows, valves, flanges, and other accessories must reach the design thickness.
3、 Do not apply too much force when bonding with glue, and all interfaces between materials should be bonded under slight compression.
4、 During installation, large pipes should be installed first, followed by small pipes, elbows and tees first, then straight pipes, and finally valves and flanges.
5、 When installing chilled water pipes and refrigeration equipment, the gaps between the two ends of the rubber pipe and the iron pipe need to be coated with glue and bonded together, and the bonding width should not be less than the thickness of the rubber material.
6、 The cutting edge of the pipeline should be installed as inconspicuously as possible, and the cutting edges of the two pipes should be staggered from each other.
7、 Do not install the machine during use, after installation36Do not turn on the device within hours.
8、 The large-diameter rubber tube has become elliptical due to packaging reasons. Please cut the flatter side when cutting it open.