Welcome Customer !

Membership

Help

Beijing Beiguang Jingyi Instrument Equipment Co., Ltd
Custom manufacturer

Main Products:

plast-mach>Products
Product Categories

Beijing Beiguang Jingyi Instrument Equipment Co., Ltd

  • E-mail

    2212240822@qq.com

  • Phone

    18911395947

  • Address

    514, Unit 1, Building 2, Xingfu Square, Gu'an County, Langfang City, Hebei Province

Contact Now

How much is the electrical strength tester for insulated hoses

NegotiableUpdate on 02/16
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
Resin ceramic voltage breakdown electrical strength tester for testing the breakdown voltage, breakdown strength, and withstand voltage of laminated products, mica and its products, plastics, film composite products, ceramics, and glass under power frequency voltage.
Product Details

Resin ceramic voltage breakdown electrical strength testerGB1408.1-2016 "Test Methods for Electrical Strength of Insulation Materials Part *"; Test under Power Frequency, Part 2

GBT13542.1-2009 Thin Films for Electrical Insulation Part *

GB/T1695-2005 "Determination method for power frequency breakdown voltage strength and withstand voltage of vulcanized rubber"
GB/T 3333-1999 "Test Method for Power Frequency Breakdown Voltage of Cable Paper" Scope 1

This part of GB/T 13542 specifies the definition, general requirements, dimensions, inspection rules, marking, packaging, and transportation of thin films for electrical insulation

Transportation and storage.

This section applies to thin films for electrical insulation,

2 Normative References

The clauses in the following documents are referred to as clauses in this section of GB/T 13542. Any citation with a date

All subsequent modification orders (excluding errata) or revised versions are not applicable to this section. However, it is encouraged to reach an agreement based on this section

The parties to the agreement are studying whether versions of these documents can be used. For any reference document without a date, its version applies to this document

part

GB/T 13542.2-2009 Thin Films for Electrical Insulation Part 2: Test Methods (IEC60674-2:1988, MOD)

3 Terms and definitions

The following terms and definitions apply to this section.

3.1

Windability of winding

The winding performance of the film is used to evaluate the deformation of the rolled film, which can be measured by two aspects: offset/curvature and indentation.

3.1.1

Offset/Arc Bias Camber

When the film is opened flat, its edges do not form a straight line (offset or arc)

3.1.2

depression

sag

When a section of film is supported by two parallel rollers in a horizontal position and subjected to a certain tension, some of the film will be lower than the total

The horizontal plane. Special requirements for joint heat resistance or solvent resistance should be negotiated between the supply and demand parties.

4.4 Tube core

The film should be wound on a circular core, and the core should not shed chips, collapse, or twist under winding tension, nor should it damage the film or reduce its performance

Low. All performance and dimensions of the die, as well as their deviations, shall be negotiated between the supply and demand parties. The preferred inner diameters of the die are 76 mm and 152 mm, and the die can be

Extend the end of the film roll or align it with the end.

5 sizes

5.1 Thickness

Measure the thickness according to the method described in Chapter 4 of GB/T 13542.2-2009, unless otherwise specified in the product standard, and the measured thickness

Should be within ± 10% of the nominal value.

5.2 Width

The width should be specified in the product standard and measured according to the method specified in Chapter 6 of GB/T 13542.22009, unless otherwise specified in the product standard

Unless otherwise specified, the allowable deviation shall comply with the provisions of Table 1.

Table 1 Film Width

Unit in millimeters

width

bias

≤50

±0.5

>50~300

±1.0

>300~450

±2.0

>450

±4.0

5.3 Length

The requirements for length are specified by product standards.

The inspection rules GB/T 13542 "Thin Films for Electrical Insulation" are divided into the following parts:

Part 1: Definition and General Requirements;

Part 2: Experimental Methods;

Part 3: Biaxially oriented polypropylene thin film for capacitors;

Part 4: Polyester Film

.

This section is the first part of GB/T13542.

This section is modified to adopt IEC60674-1:1980 "Plastic films for electrical purposes - Part 1: Definitions and general requirements" (English version).

The main technical differences between this section and IEC60674-1 are as follows:

1) Added a chapter on 'Normative References';

2) Added a chapter on 'Inspection Rules'.

This section replaces GB/T 13542-1992 "General Requirements for Plastic Film for Electrical Use",

The main differences between this section and GB/T 13542-1992 are as follows:

1) Change 'reference standard' to 'normative reference document'

2) Change "skew" to "offset/arc" in Definition 3.1.1.

This section was proposed by the China Electrical Appliances Industry Association.

This section is under the jurisdiction of the National Technical Committee for Standardization of Insulation Materials (SAC/TC51),

Our drafting units are Guilin Institute of Electrical Science and Dongcai Technology Group Co., Ltd.

The main drafters of this section are Wang Xianxiu and Zhao Ping.

The previous versions of the standards replaced by this section are:

GB/T13542-1992。

6.1 The film should undergo factory inspection and type inspection.

6.2 The type inspection items refer to all the technical requirements specified in the product standard, and shall be conducted at least once every three months. When there is a change in raw materials

When the process conditions change, type inspection should also be conducted.

6.3 The batch size, sampling method, and factory inspection items of the product are specified in the product standard. Each batch of film should undergo factory inspection, and the product should be inspected

Qualified before leaving the factory. The manufacturer shall ensure that the products leaving the factory meet all technical requirements specified in the product standards.

When any of the test results does not meet the technical requirements, a set of samples should be taken from each of the other two rolls of the batch of film to repeat the test

If there is still one group that does not meet the requirements, the batch of films is considered as unqualified.

6.5 The user unit may conduct acceptance inspection according to all or part of the product standards. Preprocessing conditions shall be in accordance with GB/T13542.2-2009

Requirement 3.2 requires it to be carried out.

When requested by the user, the manufacturer shall provide a product inspection report.

7 Marking, packaging, transportation, and storage

7.1 The film roll should be wrapped in moisture-proof paper or plastic film, wrapped in a plastic bag on the outer layer, and placed in an elevated support in the packaging box, so that the film is in normal condition

Fully protected from damage and deterioration under storage and transportation conditions.

7.2 Each box of film should have clear and sturdy markings:

TVS instantaneous suppression protection technology

Multi level cyclic voltage acquisition technology:

After material breakdown, the instantaneous discharge speed is about 1/5~1/3 of the speed of light. The internationally recognized method for collecting breakdown voltage is the voltage drop method. The instantaneous decrease of the primary voltage of the transformer by a certain ratio is used to determine whether the material has broken down. Obviously, there is a deviation in recording the breakdown voltage value. The use of multi-level cyclic acquisition technology to collect the voltage after breakdown will solve this problem.

Low pass filtering current monitoring technology:

High frequency signals will be generated during the high-voltage discharge process. Both domestic and imported current collection sensors are mostly power frequency current sensors. When high-frequency signals cannot be processed during the collection process, it leads to inaccurate detection. Regardless of whether the sensor is designed using a flux gate or Hall principle, there may be an instantaneous output voltage or current signal that is too large after breakdown, thereby burning out the acquisition part of the control system. The low filtering current acquisition sensor developed by Huace processes high-frequency clutter signals accordingly. The protection module independently developed by Huace for same current collection ensures collection accuracy and protects collection components.

● Dual system interlocking technology and isolation shielding technology:

The dual system interlock technology is applied to electrical breakdown instruments. The voltage breakdown instruments produced by Huace not only have overvoltage and overcurrent protection systems, but also have a dual system interlock mechanism. When any component has a problem or a single system fails, the high voltage will be instantly cut off.

Product Name: Voltage breakdown tester

Product models: BDJC-10KV, BDJC-50KV, BJC-100KV

Product brand: Beijing Beiguang Jingyi

Control method: computer-controlled

Compliant with standards such as GB/T1408, ASTM D149, IEC60243-1, etc

Applicable materials: rubber, plastic, film, ceramic, glass, paint film, resin, wire and cable, insulation oil and other insulation materials

Test items: breakdown voltage test, dielectric strength test, electrical strength test, withstand voltage breakdown strength test, etc

Test voltage: 10KV, 20KV, 50KV, 100KV, 150KV, etc

Voltage accuracy: ≤ 1%

Applicable materials: Insulation materials

Boosting rate: 10V/S-5KV/S

Test methods: AC/DC, withstand voltage, breakdown, gradient boosting

Control system: PLC controls voltage rise

Core components: using imported accessories

Test medium: insulating oil, air

Display mode: curve display, data printing

Other features: Wireless Bluetooth control

Equipment composition: host, computer, electrode

Electrode specifications: 25mm, 75mm, 6mm

Electrical capacity: 3KVA, 5KVA, 10KVA

Voltage endurance time: 0-8H

Security protection: Level 9 security protection

Warranty period: Three years, lifetime maintenance.

Training method: Engineer on-site training for installation

Certificate of issuance: 514 institutions, 304 institutions, scientific research institutes, and other units are all eligible

Host size: 1000 * 600 * 1400mm, 1700 * 600 * 1400mm

Host weight: 100KG, 200KG

Beiguang Product Warranty and After sales Service Commitment:

1、 Installation and commissioning: Assist in the installation of the testing machine, responsible for the transportation and commissioning of the testing machine.

2、 Acceptance criteria: The testing machine shall be accepted according to the ordered technical attachments. The final acceptance shall be conducted by the buyer, who shall test the samples provided by the user and provide a test report.

3、 Training: During installation and debugging, 2-3 operators will be trained free of charge at the instrument operation site. These operators should be long-term and stable employees selected by the demand side. After the training, they will be able to understand and apply the basic principles, software usage, operation, and maintenance of the equipment, enabling them to independently operate the equipment for sample testing and analysis, as well as perform basic maintenance.

4、 Software upgrade: Free lifetime provision of new version control software.

5、 Warranty: 1. The equipment is guaranteed for two years, with lifelong after-sales service. Parts that are not damaged by human factors will be replaced free of charge within one year. During the warranty period, the latest response time is within 2 hours after receiving the user's invitation. After confirming the fault with the user, our company will send engineers to the site for free service within 48 hours to quickly identify the location and cause of the fault, and report the cause and troubleshooting methods to the user in a timely manner.

2. During the warranty period, parts damaged by human factors will be replaced at the purchase (processing) price.

3. Continue to provide high-quality technical services to users outside the warranty period, and dispatch engineers to the user's site for repairs within 3 days after receiving the user's repair invitation. And enjoy preferential treatment for purchasing spare parts.

4. Overloading of sensors and damage to the overall circuit caused by overvoltage are not covered by the warranty.

6、 After sales management:

Our company implements computerized management, implements a regular telephone follow-up system for customers, regularly reviews the working condition of equipment, provides regular telephone guidance to users on equipment maintenance and testing to ensure normal operation, tracks customer equipment usage, and enables timely maintenance of equipment

Safety protection measures for voltage breakdown tester: Company profile

Beijing Beiguang Precision Instrument Company is a professional company engaged in testing instruments, with modern design and development technology and production equipment. Actively focusing on the production and development of a variety of high-performance testing equipment and non-standard automation equipment, the main R&D and production products are: insulation material testing instruments (voltage breakdown tester, resistivity tester, dielectric constant tester, leakage tracking tester, arc resistance tester, etc.) sponge foam testing instruments (ball drop rebound tester, compression deformation tester, indentation hardness tester, fatigue impact tester, etc.), mechanical equipment(universalThe quality of the testing machine has reached a certain level.

Resin ceramic voltage breakdown electrical strength tester

微信图片_20231025101008.jpg